CONSTRUCTION TRADITION CONSTRUCTION TRADITION

Construction tradition which begins before more than 70 years, following newest trends in the field and applying new technologies resulted in systematic development. During those years company has specialized in conducting the most challenging projects such as main oil&gas pipelines, pipelines for potable water transport and other media.

MAIN PIPELINES

Main pipelines as a backbone of transportation system are necessary prerequisite for economic transport of vital resources such as natural gas, crude oil, potable water and for that reason represents critical infrastructure of any country. In today’s time of globalization and mutual integration represents real connections between countries and continents.

Monter-strojarske montaže d.d.

The company Monter-strojarske montaže d.d. by systematically investing in the quality and knowledge of its employees, modern equipment, and continuous improvement of business processes it has reached the ability to build main pipelines with a diameter of up to DN1000.

Monter-strojarske montaže d.d.

In addition to the construction of the main pipelines, we also build all accompanying objects on the main pipelines such as compressor stations, block stations, local/regional gas distribution nodes, receiving stations, metering, and reducing stations which we prove with successfully completed projects in the country and abroad.

FULL SERVICE FULL SERVICE

As a company specialized in the construction of main pipelines, we are able to offer a complete service which include:

excavation

backfilling and terrain restoring,

pipe transport

assembly and welding

cold bending pipes up to DN800

pipe laying

joining of laid segments

insulation of welded joints

cleaning and calibration

hydrotesting

OWNERSHIP OF MACHINERY AND EQUIPMENT

Ponosni smo što smo u posjedu mehanizacije i opreme za najzahtjevnije projekte izgradnje magistralnih cjevovoda, koja uključuje 10 cjevopolagača, 6 bagera >30 t, 5 gusjeničara opremljenih šatorima i automatima za zavarivanje, 5 tegljača sa prikolicama i labudicama za prijevoz teških tereta, 3 savijačice za hladno savijanje lukova, sušare, kontejnerske pumpe za provođenje ispitivanja instalacije na čvrstoću, kompresora i pomoćnog pribora i alata.

10

Pipelayer

6

Bagera>30 t

5

Crawlers equipped with tents and welding machines

5

Tractor with trailers and swans for transporting heavy loads

3

Benders for cold bending of bows

In addition to the above, we are able to offer our partners a part of the service related to the construction of main pipelines (pressure testing with water, cold bending of Ø2″ – Ø32 arcs, cleaning, calibration and drying).

ISKUSTVO U IZGRADNJI
MAGISTRALNIH CJEVOVODA

Following to extensive experience in the construction of main pipelines, we also have a series of successful projects in construction of gas supply pipelines, oil pipelines, water pipelines, hot water pipelines of various diameters and pipeline materials (steel, PE-HD, PTFE…), spherical and cylindrical tanks, steel tanks with solid or floating roof, manufacturing and installation of load-bearing bridges for pipelines, and all types of steel structures for various purposes (halls, supporting structure for flares in the oil refineries).

Copyright - Monter strojarske montaže | Izrada: ILI NET